| Brand Name: | IDO |
| Model Number: | refrigerator back panel |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Metal Stamping Die DC52D Stage Die For Refrigerator Back Panel With Slow Speed Milling
Description:
Our Stage Die for Refrigerator Back Panel is expertly engineered to streamline the sheet metal forming process, delivering consistent precision and superior quality for every component. Designed with multiple progressive stages, it efficiently handles blanking, bending, embossing, and piercing, ensuring each back panel meets stringent dimensional and aesthetic standards. Constructed from high-strength steel and built for durability, this die maintains accuracy even under continuous production cycles. With customization options for different panel designs and sheet thicknesses, it provides flexibility for a wide range of refrigerator models. Combining reliability, efficiency, and precision, this stage die is an essential solution for modern refrigeration manufacturing.
Quick Detail:
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()