| Brand Name: | IDO |
| Model Number: | dishwasher tub top |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Steel Stamping Die Stage Die For Dishwasher Tub Top Mould Size 2100×1000×600mm
Description:
The Steel Stamping Die Stage Die for Dishwasher Tub Top with mould size 2100×1000×600mm is engineered for precise and efficient sheet metal forming. Made from high-quality steel, this stage die ensures accurate shaping of dishwasher tub top components, maintaining tight tolerances and reliable performance. Its large mould size supports heavy-duty production, making it an ideal solution for appliance manufacturers seeking durable, high-precision, and high-efficiency stamping tooling.
Quick Detail:
Cycle: 6–14 seconds, depending on the product.
Repairs finished within 30 minutes; tools replaced in 15 minutes.
Punch edges sharpened every 300,000–500,000 strokes.
Software manages die motion.
Cabinets are produced using only one press table and tool set, lowering equipment cost.
Maintenance requires removing only sub-dies.
A single tool set produces multiple models; program-controlled changeover.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()