Good price  online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Metal Stamping Mold
Created with Pixso. 1300MM 2T Refrigerator Cabinet Bottom Metal Stamping Mold Stage Mold 500k Cycles

1300MM 2T Refrigerator Cabinet Bottom Metal Stamping Mold Stage Mold 500k Cycles

Brand Name: IDO
Model Number: refrigerator cabinet bottom
MOQ: 1 set
Price: $10000-$50000
Delivery Time: 45days
Payment Terms: L/C,T/T
Detail Information
Place of Origin:
China
Certification:
ISO9001
Part Name:
Refrigerator Cabinet Bottom
Part Material:
DC51D
Mould Type:
Stage Mold
Mould Size:
1300*1000*600mm
Mould Weight:
2T
Punch Tonnage:
200T
Processing Method:
Punching And Shearing Mould
Technics:
Cutting Die
Packaging Details:
Wooden Case, Anti-Rust Oil, Vacuum Packaging
Supply Ability:
300 sets/year
Highlight:

1300MM Metal Stamping Mold

,

2T Metal Stamping Mold

,

Stage Mold 500k cycles

Product Description

Metal Stamping Mold Stage Mold Used In White Household Appliance Refrigerator Cabinet Bottom

 

Description:

Our Metal Stamping Mold Stage Mold Used in White Household Appliance Refrigerator Cabinet Bottom is engineered for high-precision forming of refrigerator cabinet bottom components. Designed for durability and consistent performance, this mold ensures accurate dimensions, stable production cycles, and long service life. Suitable for various sheet metal materials used in white household appliances, it helps manufacturers enhance production efficiency, maintain product quality, and support reliable large-scale manufacturing operations.

 

Quick Detail:

  • Cycle runs 6–14s as per product.
  • Maintenance finishes in 30 min; tool swap in 15 min.
  • Punch edges sharpened at 300k–500k cycles.
  • Software directs each die’s action.
  • One press table + tool set reduce cabinet production cost.
  • Only sub-die removed during repair.
  • One tool set for different models with program changeover.

 

Specifications:

Mould/Tool Type
Stage tool/mould/die
Production Application
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
Metal Sheet Material
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
Mould Material
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
Mould Base
SD, LKM Standard, HASCO Standard, Self-made, etc.
Tolerance
±0.003mm
Hardness
Upon request
Surface Treatment
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
Precision Machining
CNC/ surface grinding machine/ wire cutting/ EDM
Measuring Instruments
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer /  caliper/ microscope/ micrometer, etc.
Drawing Format
DWG, STP, STEP, X_T, IGES, PDF
Design Software
Auto CAD, UG, Solidworks
Trade terms
FOB (Shanghai)
Mould Lead time
Generally 6~8 weeks (as per actual situation)

 

 

 

1300MM 2T Refrigerator Cabinet Bottom Metal Stamping Mold Stage Mold 500k Cycles 0

1300MM 2T Refrigerator Cabinet Bottom Metal Stamping Mold Stage Mold 500k Cycles 1