| Brand Name: | IDO |
| Model Number: | refrigerator back panel |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Metal Stamping Mold Stage Mold For Refrigerator Back Panel Household Appliance
Description:
Our Metal Stamping Mold Stage Mold for Refrigerator Back Panel Household Appliance is engineered for precise forming of refrigerator back panel components. Designed for durability and stable performance, this mold ensures accurate dimensions, consistent quality, and long service life. Compatible with various sheet metal materials used in white household appliances, it helps manufacturers enhance production efficiency, maintain product standards, and support reliable large-scale manufacturing operations.
Quick Detail:
The line operates at 6–14s cycle per item.
Quick repair 30 min; quick tool change 15 min.
Punch edge sharpening after 300,000–500,000 hits.
Each die movement software-controlled.
One press table and tooling produce cabinets to reduce investment.
Only sub-die removed for maintenance.
One tool set for various models; program-driven changeover.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()