| Brand Name: | IDO |
| Model Number: | microwave oven top |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Metal Stamping Mold For Stage Mold Of Home Appliance Microwave Oven Top
Description:
Our Metal Stamping Mold for Stage Mold of Home Appliance Microwave Oven Top is engineered for high-precision forming of microwave oven top components. Designed for durability and consistent performance, this mold ensures accurate dimensions, stable production cycles, and long service life. Suitable for various sheet metal materials used in household appliances, it helps manufacturers enhance production efficiency, maintain product quality, and support reliable large-scale manufacturing operations.
Quick Detail:
Cycle: 6–14s according to product.
Fast repair <30 min; tool change <15 min.
Punch edge sharpening at 300k–500k.
Software controls die motions.
Cabinet production with one press table & tool set saves equipment.
Only sub-die removed for service.
One tool set supports different models; changeover via program.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()