| Brand Name: | IDO |
| Model Number: | microwave oven baffle |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Stage Die Microwave Stamping Die For Microwave Oven Baffle With Mould Size 850*550*345mm
Description:
Our Stage Die Microwave Stamping Die for Microwave Oven Baffle – Mould Size 850×550×345mm provides precise, durable, and efficient stamping for microwave oven baffle components. Designed for high-volume production, it ensures consistent quality, accurate dimensions, and reliable long-term performance.
Our Advantages:
We are equipped with CNC machining centers, CNC wire-cutting machines, precision testing instruments, and a complete set of supporting equipment. Specializing in metal stamping molds and automation systems, we manage the entire process—from mold design, fabrication, and assembly to debugging, production, and full stamping automation solutions. Leveraging our extensive technical expertise, we overcome industry challenges and deliver comprehensive one-stop services for our customers.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()