| Brand Name: | IDO |
| Model Number: | washing machine front cover |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Stamping Die Stage Die For Washing Machine Front Cover With 1,000,000 Shots Mould Life
Description:
As a leading Chinese manufacturer of stamping dies, we specialize in high-durability tooling for the washing machine industry. We design and build precision stage dies for washing machine front covers, guaranteed with a 1,000,000-shot mould life. Our focus on long-lasting performance helps you maximize production efficiency and reduce maintenance costs.
Comprehensive Stamping Solutions:
We offer a complete, one-stop service for all your metal stamping needs. Our process covers every step from mold design, processing, and assembly to debugging, manufacturing, and full automation solutions. With our advanced equipment, including CNC machining centers and wire-cutting machines, and deep technical expertise, we efficiently solve industry challenges to deliver comprehensive support.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()