| Brand Name: | IDO |
| Model Number: | washing machine rear cover |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Stage Die For Washing Machine Rear Cover Stamping Die 1200*950*560mm
Description:
As a professional Chinese stamping die manufacturer, we specialize in high-precision tooling for the washing machine industry. Our expertise includes designing and building stage dies for washing machine rear covers. This specific die, with dimensions of 1200 x 950 x 560mm, is engineered to ensure efficient, accurate, and reliable production for your stamping needs.
Proven Quality & Worldwide Exports:
Recognized and approved by our valued customers, our molds are exported to over 30 countries, including Egypt, Bangladesh, Mexico, Thailand, and Russia. We have established strong, long-term relationships with global leaders like Haier, Hisense, B/S/H, Midea, Condor, and IFB by providing comprehensive support, including free prototype and visual design services along with excellent after-sales support.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()