| Brand Name: | IDO |
| Model Number: | refrigerator water drain box |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
DC51D Stage Die For Refrigerator Water Drain Box Stamping Die 2T Mould Weight
Description:
As a leading Chinese manufacturer, we specialize in high-quality stamping dies for the refrigeration industry. This stage die is expertly designed for producing refrigerator water drain boxes from DC51D sheet metal. With a robust 2-ton mould weight, our tooling is built for precision, durability, and high-volume production. We guarantee a reliable and efficient stamping process that meets all your manufacturing needs.
Quick Detail:
Material Compatibility: The die can process a wide range of materials, including SUS430, DC53D, and various galvanized steels.
Part Thickness: Our dies are designed to handle material thicknesses from 0.5 mm to 2.0 mm.
Product Type: The die is specifically engineered for key components like washing machine side panels and refrigerator front doors.
Finished Part Dimension: The die consistently produces parts that meet specific customer-provided dimensions.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()