| Brand Name: | IDO |
| Model Number: | refrigerator cabinet bottom |
| MOQ: | 1 set |
| Price: | $10000-$50000 |
| Delivery Time: | 45days |
| Payment Terms: | L/C,T/T |
Stage Die For Refrigerator Cabinet Bottom Steel Stamping Dies 1300×1000×600mm
Description:
The Stage Die for Refrigerator Cabinet Bottom Steel Stamping Dies with dimensions 1300×1000×600mm is engineered for precise and efficient sheet metal forming. Made from high-quality steel, this stage die ensures consistent shaping of refrigerator cabinet bottom components, maintaining tight tolerances and reliable performance. Its robust design and ample mould size make it an ideal solution for appliance manufacturers seeking durable, high-precision, and high-efficiency stamping tooling.
Quick Detail:
Cycle duration: 6–14 seconds, product-dependent.
Repair completed in 30 minutes; tool change in 15 minutes.
Punch edges sharpened every 300,000–500,000 strokes.
Die movements are software-regulated.
Cabinets require a single press table and tool set, cutting equipment costs.
Only sub-dies need dismantling for maintenance.
One tool set supports several models; tool changeover controlled by program.
Specifications:
|
Mould/Tool Type
|
Stage tool/mould/die
|
|
Production Application
|
White Household Appliances (washing machine, refrigerator, dryer, dishwasher…), Automobile (heat shield, radiator...)
|
|
Metal Sheet Material
|
Stainless Steel (304, 430...), PCM, VCM, SGCC, Aluminum (6061, 6063,7075...), Copper
|
|
Mould Material
|
V8, ASP60, P20, ASSAB88, XW-42, SKD11, DC53, CR12MOV, AMPCO25
|
|
Mould Base
|
SD, LKM Standard, HASCO Standard, Self-made, etc.
|
|
Tolerance
|
±0.003mm
|
|
Hardness
|
Upon request
|
|
Surface Treatment
|
TiCN/ Polishing/ mirror polishing/ plating/ heat treatment / Deep Cooling or according to your parts
|
|
Precision Machining
|
CNC/ surface grinding machine/ wire cutting/ EDM
|
|
Measuring Instruments
|
CMM/ Profile projector/ electronic height gauge/ spectrum analyzer / caliper/ microscope/ micrometer, etc.
|
|
Drawing Format
|
DWG, STP, STEP, X_T, IGES, PDF
|
|
Design Software
|
Auto CAD, UG, Solidworks
|
|
Trade terms
|
FOB (Shanghai)
|
|
Mould Lead time
|
Generally 6~8 weeks (as per actual situation)
|
![]()
![]()